2030 Master Plan

Executive Summary

Back

This report documents the latest expressway plan update for the Orlando-Orange County Expressway Authority (Expressway Authority), the 2030 Expressway Master Plan. The goal of this study was to develop a long range expressway master plan which identified Expressway Authority policies and direction, tolling and revenue, and capital projects through the year 2030, based on the Expressway Authority Board’s vision and compatibility with area needs.

Download The Required Adobe Reader

Downloads